DGI stripped these units back to bare frame and performed NDT testing, prior to repairing fractured areas of the frames. Mount points were line bored and holes re-threaded, prior to painting inside DGI’s mine-spec paint bay.
Upon completion of these frames being recondition within Hitachi-specifications, shipping was expedited to a client in the Americas.